Archive for the ‘progress’ Category

 
 

Read Full Post »

Mixed textures reveal the true diversity of this home.

Front exterior, still working on the details.
 

Read Full Post »

 
 
 

 Kitchen cabinets by Living Edge in Whistler.
 
Fridge location 

Warm colours enhance wood clear fir finishes.

Read Full Post »

Read Full Post »

Spray insulation provided by Island & Interior Basement Systems and AJ Spray Insulation. 1/2 lb and 2 lb were used throughout the building.

Read Full Post »

Here the boys are putting down removable plywood that holds up the concrete slab until it cures.
The metal floor trusses will remain as part of the house.

The vertical pieces of steel will be bent over to tie into the slab above the garage.

Read Full Post »

This overview shows the courtyard columns, and the formwork for the master closet and bath wall (on the right)

Here’s the wall as we strip off the forms…

… an overview of the East wing….

Read Full Post »

Here’s the gang stripping off the formwork for the columns that lead into the backyard….

 

 
This is the view you will see as you stand at the bottom of the stairs….
 

Read Full Post »

Up until now, most of the rammed earth walls have been tarped….  This is the first time we’ve exposed all the walls at the same time……
It’s finally starting to look like a house!

This is the massive Glu-Lam Header above the garage door…. it carries a lot of load from the deck/roof above the garage.

This is [...]

Read Full Post »

Crane Day!

Here we are getting ready to place beams over the windows, the garage door, and on top of the rammed earth walls (to connect everything together).

These are the posts in the corner of the 2nd bedroom…. they carry the load over the doors and windows that face the courtyard.

This is the header above the stairway:

… Here [...]

Read Full Post »