Rammed Earth home in the finishing stages.
Posted in progress on August 19, 2009 | Leave a Comment »
Amazing building exterior!
Posted in progress on July 14, 2009 | Leave a Comment »
Mixed textures reveal the true diversity of this home.
Front exterior, still working on the details.
Painting and kitchen cabinets in progress..
Posted in progress on July 14, 2009 | Leave a Comment »
Kitchen cabinets by Living Edge in Whistler.
Fridge location
Warm colours enhance wood clear fir finishes.
Drywall under way, by the ‘Mud Slinger’
Posted in progress on June 26, 2009 | 1 Comment »
Interior walls are ready for DRYWALL!!
Posted in progress on June 11, 2009 | Leave a Comment »
Spray insulation provided by Island & Interior Basement Systems and AJ Spray Insulation. 1/2 lb and 2 lb were used throughout the building.
Preparing to pour the 2nd floor slab
Posted in progress on August 14, 2008 | Leave a Comment »
Here the boys are putting down removable plywood that holds up the concrete slab until it cures.
The metal floor trusses will remain as part of the house.
The vertical pieces of steel will be bent over to tie into the slab above the garage.
Master bed/bathroom walls starting to take shape
Posted in progress on August 14, 2008 | Leave a Comment »
This overview shows the courtyard columns, and the formwork for the master closet and bath wall (on the right)
Here’s the wall as we strip off the forms…
… an overview of the East wing….
courtyard columns done….
Posted in progress on August 5, 2008 | Leave a Comment »
Here’s the gang stripping off the formwork for the columns that lead into the backyard….
This is the view you will see as you stand at the bottom of the stairs….
House Starting to Take Shape!
Posted in progress on July 28, 2008 | Leave a Comment »
Up until now, most of the rammed earth walls have been tarped…. This is the first time we’ve exposed all the walls at the same time……
It’s finally starting to look like a house!
This is the massive Glu-Lam Header above the garage door…. it carries a lot of load from the deck/roof above the garage.
This is [...]
Crane Day!
Posted in progress on July 28, 2008 | Leave a Comment »
Here we are getting ready to place beams over the windows, the garage door, and on top of the rammed earth walls (to connect everything together).
These are the posts in the corner of the 2nd bedroom…. they carry the load over the doors and windows that face the courtyard.
This is the header above the stairway:
… Here [...]