We prepared most of our beams on top of the garage roof. We then craned them into place on top of the steel or wooden posts….

… placing beams….

 
Here’s Al, surrounded by some of the timberwork:

…these are rafters, waiting to get lifted up onto the beams….

….placing rafters, which will be spread out into position later….

You can [...]

Read Full Post »

You can see all the radiant lines for heating…. we will be capturing excess heat from wastewater and vented air and will transfer that heat into the floors…..

… notice how we insulate the edge of the floor slab so that heat isn’t lost to the outside. The floors will be colored in order to capture [...]

Read Full Post »

… you can also see the in-floor heating pipe (in red) awaiting concrete in the rear section of the house.
There will be a few retaining walls in the front of the house….. more photos to come…..