
Drywall progress

kitchen drywall
Posted in progress | 1 Comment »

West wing view, insulated with spray foam.

Interior framing

East wing fully spray insulated

Kitchen ready for Drywall
Posted in progress | Leave a Comment »

Finished east wing siding

Paperstone siding panels, good looks and low maintenance.

Paperstone siding attachment process, creates an air channel behind the panel.

Paperstone panels, exposed beams and grey fascia create a beautiful contrast.

West sing siding in progress.
Posted in Uncategorized | Leave a Comment »
April 29, 2009 by Richard

Mark Smith from Falcon Railings Vancouver, has brought us a sample of the amazing looking railings. They will even colour match to the windows!
Posted in Uncategorized | Leave a Comment »
April 29, 2009 by Richard

West wing main floor framing

East wing main floor framing
Posted in Uncategorized | Leave a Comment »
April 22, 2009 by Richard

Master Bedroom polished floor

Bedroom polished floor
Posted in Uncategorized | Leave a Comment »
April 22, 2009 by Richard

Window details


Exterior window details, rammed earth wall instalation.

Windows installed in Entry
Posted in Uncategorized | Leave a Comment »